Phase 1 - Rough Clean
This 1st phase generally occurs after the framing, plumbing, and electrical have been inspected and completed. It may also include removal of large debris and trash, a general sweep out, and removal of obstructions. This will help prepare for incoming painting, flooring, fixtures and cabinetry contractors.
Phase 2 - Prep Clean
The 2nd phase involves detailed cleaning of kitchen and washrooms including sinks, tubs, showers, cabinets and countertops. During this phase, detailed cleaning of baseboards, light fixtures, door frames, window ledges, interior windows, mirrors, with floors being vacuumed and mopped.
Phase 3 - Final Clean
The 3rd and final stage occurs when all contractors have completed their work. All areas are swept, carpets are vacuumed, floors are mopped and any remaining dust is addressed at this stage. All cleaning requirements from the second phase are reviewed to ensure the building is in ‘Opening Day’ ready condition. Once the final elements are installed, a more thorough and detailed interior cleaning must take place. The details of this type of cleanup vary
significantly from room to room. Kitchens and bathrooms, for example, include cabinetry, appliances, fixtures, and countertops that all need
specialized care. However, a good final interior cleanup always includes a few key jobs:
• Cleaning walls, including removing dust, dirt, scuff marks, and smudges

The cost can certainly vary from worksite to worksite. There aren't any other special considerations to accommodate as we cover most services needed. Most jobs fall between:
$.15 - .19 sq/ft -2500 sq/ft
$.20 - .25 sq/ft +2500 sq/ft